JUJEA flow measurement selection

Start with the fluid and the pipe. A temporary survey on an operating water main raises different questions from a permanent meter that will become part of the process pipework.

Typical supply is 1–2 weeks. Allow 2–4 weeks for enclosures and large flow meters. ProSense engineers assist with model selection. Sales confirms availability and logistics emails the order ETA.

Circular clarifiers and walkways at a water treatment plant
Industrial water treatment application

Choosing equipment

Clamp-on ultrasonic survey
Record the pipe outside diameter, wall thickness, pipe and liner material, and the clear length either side of the proposed position. Identify the liquid and how you will check that the pipe stays full. For a small-pipe X3 enquiry, use its own manual to check fit.
Inline metering
For an electromagnetic meter, provide fluid conductivity, bore, liner and electrode requirements. For a turbine meter, include viscosity, cleanliness and the expected operating flow range. In both cases specify the connections, installation access and any planned shutdown.
Evidence for handover
Agree whether operations need a spot check, continuous flow rate or totalised volume. Name the receiving input or logger and identify a reference reading for the commissioning record.