Wind monitoring for exposed worksites

A reading from a sheltered building can differ materially from the conditions at an exposed work area. Agree the measurement location and which site role uses the reading before choosing a sensor, display or alert method.

Gantry cranes and equipment in an exposed freight terminal

Equipment and data path

Who needs the wind reading at the work area, and who needs a remote notification or a historical record?

Choose the exposure

Provide the proposed mounting location, nearby obstructions, access and power. Ask the responsible site team to approve how representative that location is.

Define the reading

Specify the units, averaging period and whether peak gusts must be captured. Select the sampling and transmission intervals against the use case.

Set the response path

Choose local visibility, remote recording or both. The site owner supplies its action thresholds, responsibilities and escalation procedure.

Equipment, systems and software

Where to buy

Checks to agree before handover

  • Compare the units, averaging window and timestamp at the local display and remote dashboard.
  • Witness each configured notification through the site-approved test function or controlled test procedure.
  • Agree how power loss, stale readings and communications failure are presented to the site team.

Application guide published by ProSense Group.

Talk to our national team

Send your equipment schedule, site locations or monitoring brief. We’ll direct it to the team responsible for your application.

Contact ProSense Group