Acrel switchboard energy meters compared
Start with the single-line diagram. Mark which feeders share a voltage source, which current transformers are already installed and where the readings must go. Those three decisions narrow the meter choice.

Compare models
| Model | When it fits | Confirm before ordering | Documents and sourcing |
|---|---|---|---|
Acrel ADW210Several feeders at one switchboard |
Group nearby feeders when the electrical design lets them share the same voltage reference. The ADW210 can cover up to four three-phase circuit groups in the appropriate configuration. | Mark the voltage source for each feeder, including changeover or UPS operation. Specify the channel count, conductor dimensions and matching CT pack. | |
Acrel ADW300One metering point with a defined data connection |
Consider the ADW300 family for one incoming supply, machine or remote feeder. Select the communications version to suit the site and receiving system. | Identify the standard or ADW300W variant, current input and ordered interface. The W model uses matching mA-output CTs. Confirm network coverage, gateway needs and power for the proposed connection. | |
Acrel ADL3000-EOne meter per feeder |
A separate meter on each feeder keeps the feeder identity with the instrument. The photo shows the 1(6) A input version. ProSense Solutions lists one-machine and three-feeder CT-input kits. | Record the full suffix and CT secondary on the schedule. The dedicated ADL3000-E-CT uses its matched mA-output transformers. Existing 1 A or 5 A CTs require a meter explicitly rated for that secondary. |
What to check at handover
- Acrel ADW210
Map each meter channel to a labelled feeder so the operator can identify which load changed.
- Acrel ADW300
Check one meter reading against the corresponding dashboard tag, units and timestamp.
- Acrel ADL3000-E
Record the CT ratio, feeder identity and change in kWh over the same interval at the meter and in the report.
What to include in your enquiry
Send a feeder schedule, board locations, CT nameplate details, required quantities, communications route and an example of the report the customer expects.
Talk to our national team
Send your equipment schedule, site locations or monitoring brief. We’ll direct it to the team responsible for your application.