Identify the metered load
Mark the feeder and any other equipment it supplies. Give the electrical team the supply details, expected current range and proposed meter location so they can select a compatible meter and current transformers.
An electricity trend shows when a bore pump draws power. For a useful pumping record, pair the meter with a confirmed run signal and, where volume matters, a flow total from the discharge line.

Does the operator need electricity use, actual running hours, water delivered or a comparison across several bores?
Mark the feeder and any other equipment it supplies. Give the electrical team the supply details, expected current range and proposed meter location so they can select a compatible meter and current transformers.
Identify an available drive or controller feedback point and what its states mean. For a shared panel, match each pump to its own feedback. Record any estimate based on a current threshold as an estimate.
For kilowatt-hours per kilolitre, use changes in the energy and volume totals across the same operating period. Mark missing data, a reset meter or a period with zero delivered volume for review.
The standalone meter and the 4G kit use different communications options. Specify the run-feedback and flow points separately when you need operating hours or delivered volume.
Match the current input, communications option and meter registers to the selected ADW300 and its site reporting requirements.
Use the full model code and current-input marking to distinguish conventional CT-input meters from the ADL3000-E-CT version supplied with matched mA-output current transformers.
Send your equipment schedule, site locations or monitoring brief. We’ll direct it to the team responsible for your application.