Remote tank and pump telemetry
Define level, pump state and communications for sites where a low tank or failed pump needs a field response.
A pump station tender can cover the flow meter, the work to bring its reading into the existing PLC, and the alarm the operator sees when flow stops. Identify who owns each job before asking for a price.

For a replacement meter, give Instruments the existing order code, pipe size and output. If the site needs a new measurement point or PLC logic, send Solutions the instrument list and control drawing. For an operator dashboard, give ProSight a sample point list, the reporting interval and an example of the alarm the duty operator should see.
| Scope | Engineering decisions | Handover check |
|---|---|---|
| Field instrumentation | Determine measurement ranges, process connections, signal types, power and mounting for each tagged point. | Confirm units and scaling at the instrument, controller and operator display. |
| Controls and communications | Record PLC and HMI models, available I/O and network ownership. Define how gateways collect data from existing equipment. | Test the agreed points, command permissions and behaviour during communications loss with the site team. |
| Deployment and handover | Agree what ships configured, who installs it and which commissioning tasks are on site or remote. | Witness operation against the agreed scope and record the settings, drawings and outstanding items. |
Send your equipment schedule, site locations or monitoring brief. We’ll direct it to the team responsible for your application.