Water and wastewater

A treatment plant may have an instrument technician on site. A regional pump station may only get a visit when a tank runs low. Plan the measurement, local indication and remote alarm around the operator who will act on it.

Circular clarifiers and walkways at a water treatment plant

From pipework to the control room

ApplicationEquipment and site inputsMonitoring and response
Water transferCompare an inline meter with a clamp-on option for an existing main. Record pipe material, lining, diameter and flow range.Specify instantaneous flow, totalised volume and the time interval operations needs for water-balance checks.
Tanks and reservoirsProvide tank depth, fluid, foam conditions and access for a level sensor. Decide where a local reading is needed.Trend level and agree the low-level warning, its delay and which operator receives it.
Pump stationsIdentify run and fault signals available at the panel, along with mains or solar power and network coverage.Show pump state alongside level or pressure so a site supervisor can distinguish loss of communications from a stopped pump.

Equipment, systems and software

Where to buy

What to send for a water project

  • A marked-up pipe or tank drawing with dimensions, process fluid and normal operating range.
  • The signal or protocol expected by the existing PLC or logger, plus power and mounting arrangements.
  • The installation windows, delivery points and the person responsible for testing each signal at handover.