Energy and utilities

A site total can conceal which feeder is responsible for a peak. Start with the decision the metering should support, then map incoming supplies, sub-boards and individual high-load assets.

Busbars and high-voltage equipment in an outdoor electricity substation

Choosing the right level of metering

ApplicationEquipment and site inputsMonitoring and response
Sub-board energyRecord the supply arrangement, circuit count, expected current and space available for the meter and current transformers.Group feeders by area and compare consumption over equivalent operating periods.
Peak demandAgree the measurement window, meter clock and the loads the project needs to distinguish.Trend interval demand against operating hours so an energy manager can investigate simultaneous loads.
Multi-site reportingGroup meters by switchboard and site. Identify gateway locations, network ownership and site naming conventions.Use a common tag and unit schedule while retaining drill-down to the original measurement.

Equipment, systems and software

Where to buy

Preparing a metering schedule

  • Provide the switchboard or circuit schedule, load ranges and conductor dimensions for each measurement point.
  • Identify existing meters, available protocols and where the site permits the gateway to connect.
  • Nominate reporting intervals, site time zones and who should receive alarms or use the data.
Prepare a project brief

Talk to our national team

Send your equipment schedule, site locations or monitoring brief. We’ll direct it to the team responsible for your application.

Contact ProSense Group