Multi-site energy metering
Build a circuit and gateway schedule that supports feeder-level investigation and portfolio reporting.
A site total can conceal which feeder is responsible for a peak. Start with the decision the metering should support, then map incoming supplies, sub-boards and individual high-load assets.

| Application | Equipment and site inputs | Monitoring and response |
|---|---|---|
| Sub-board energy | Record the supply arrangement, circuit count, expected current and space available for the meter and current transformers. | Group feeders by area and compare consumption over equivalent operating periods. |
| Peak demand | Agree the measurement window, meter clock and the loads the project needs to distinguish. | Trend interval demand against operating hours so an energy manager can investigate simultaneous loads. |
| Multi-site reporting | Group meters by switchboard and site. Identify gateway locations, network ownership and site naming conventions. | Use a common tag and unit schedule while retaining drill-down to the original measurement. |
Send your equipment schedule, site locations or monitoring brief. We’ll direct it to the team responsible for your application.