Multi-site energy metering
Build a circuit and gateway schedule that supports feeder-level investigation and portfolio reporting.
A normal room temperature can mask a warm rack inlet or a leak below a cooling unit. Build the point schedule around the asset at risk, its physical location and the facilities team responsible for responding.

| Application | Equipment and site inputs | Monitoring and response |
|---|---|---|
| Rack and room conditions | Choose rack inlet and room reference points. Check probe access, mounting, power and allowable network connections. | Show readings against rack or room IDs so responders can locate the affected equipment. |
| Cooling and water ingress | Identify drip trays, underfloor routes and accessible spots for point or cable leak sensors. | Tie each alarm to a named zone and confirm the route to the on-call facilities contact. |
| Power and plant | Identify branch circuits and the signals available from metering, UPS or cooling plant interfaces. | Correlate environmental events with equipment state and preserve timestamps across systems. |
Send your equipment schedule, site locations or monitoring brief. We’ll direct it to the team responsible for your application.