Multi-site energy metering

A national energy view only works when the same tag means the same thing at every site. Start with the decision at feeder level, then work up to switchboard, building and portfolio totals.

High-voltage equipment and busbars in an outdoor substation

Equipment and data path

Does the team need to allocate consumption, explain demand peaks or compare equivalent assets across sites?

Schedule the circuits

Record phase arrangement, load range, conductor dimensions, meter model and accessible mounting space for each board. Identify any existing meter that can supply the reading.

Group meters by site

Map each meter to a gateway or existing data path. Record device addresses, communication options and who owns the connection at each building.

Define the reporting model

Agree meter hierarchy, tag names, units and aggregation intervals. Identify parent and child meters so downstream consumption is counted once.

Equipment, systems and software

Where to buy

Checks to agree before handover

  • Have the site team confirm phase mapping and current-transformer orientation against a known operating load.
  • Compare one meter’s local reading and interval total with the software view for the same period.
  • Check how missing intervals, different time zones and a reset meter appear in site and portfolio reports.

Application guide published by ProSense Group.