Multi-site energy metering
Build a circuit and gateway schedule that supports feeder-level investigation and portfolio reporting.
A mechanical contractor may be replacing a pressure switch on one air handler or preparing a monitoring package for several buildings. Name the plant item, the two measurement points and the operator responsible for the next action.

| Application | Equipment and site inputs | Monitoring and response |
|---|---|---|
| Air handling and filtration | Identify the air handler and filter bank, the two pressure take-offs, operating fan speeds and expected range. Choose a switch contact or a measured signal to match the input. | Show equipment state beside the pressure reading. Agree how a stopped fan or a filter change is displayed so the service technician has context. |
| Fan and pump drives | Supply motor and drive nameplates, supply phase, load duty and the run, speed and fault interfaces expected by the controls contractor. | Agree who verifies the replacement configuration and which status points return to the building management system. |
| Building and portfolio monitoring | List meters, leak points and room sensors by plant room, tenancy or building. Confirm where data is available and how the site network owner permits access. | Give the facility team a site-specific display and nominate who receives a building-wide or out-of-hours alarm. |
Send your equipment schedule, site locations or monitoring brief. We’ll direct it to the team responsible for your application.