Food and beverage processing

A production supervisor, a quality team and a dispatch depot may each need a different record of the same batch. Start with the point in the process where the measurement changes a decision, then identify who will use the record.

Stainless-steel brewing vessels flank a walkway in a beverage processing plant

From ingredient storage to dispatch

ApplicationEquipment and site inputsMonitoring and response
Ingredient and product tanksIdentify the liquid or bulk solid, vessel dimensions, fittings, surface conditions and access for cleaning. Obtain the site’s product-contact and cleaning requirements.Decide whether operators need a local level reading, an inventory trend or a reorder notification. Tie the measurement to the vessel and product.
Process and refrigeration temperaturesRecord the probe type, insertion length, process connection, operating range and expected controller input. State the calibration points or evidence the quality team requires.Associate the reading with the line, batch or cold room. Agree how time outside the site’s specified limits is reviewed.
Dispatch and receivingSet the transport lane, trip duration and device placement. Pair each logger with its consignment before despatch.Agree who retrieves the report at delivery and how it can be traced back to the batch and reviewed alongside dispatch records.

Preparing a production or quality brief

  • Mark the tank, line, cold store or loading point on a simple process sketch, including accessible mounting positions.
  • List the normal and exceptional operating conditions, cleaning process, receiving input and expected evidence for each point.
  • Name the person owning the production record, where it will be stored and what the receiving site needs at handover.
Prepare a project brief

Talk to our national team

Send your equipment schedule, site locations or monitoring brief. We’ll direct it to the team responsible for your application.

Contact ProSense Group