Multi-site energy metering
Build a circuit and gateway schedule that supports feeder-level investigation and portfolio reporting.
A plant upgrade often starts with one production line. The team may need to explain a stoppage, trace a process change or find where the energy went. That question determines which signals to collect and how operators should see them.

| Application | Equipment and site inputs | Monitoring and response |
|---|---|---|
| Machine state and downtime | Identify run, stop and fault signals at the machine or PLC, together with the production-state definitions. | Build a timestamped event history that shift leads can reconcile with a stoppage or changeover. |
| Process measurements | Choose pressure, temperature, flow or level instruments around the medium, process connection and existing input. | Give operators the engineering units, trend range and alarm context they use to adjust the line. |
| Drive and controls upgrades | Record the motor nameplate, duty, I/O and panel interfaces before specifying a drive, PLC or operator display. | Agree which points are read-only, which commands are in scope and who approves the commissioning checks. |