Industrial connectivity and gateways

A working gateway specification describes both ends of the connection. Record what the field device can provide and what the controller, historian or software platform expects to receive.

Monitoring screens and operators in a control room

Defining the data path

InterfaceWhat to identifyWhat to verify
At the instrumentRecord the sensor output, supply, cable route and interface available at the receiving device. For serial equipment, include the model and register information.Confirm scaling, units and the update rate against the local indication.
At the gatewaySpecify supported device interfaces and backhaul, available power, enclosure conditions and the site’s coverage or network constraints.Agree behaviour during a network interruption, including any required buffering and how a stale reading is reported.
At the platformChoose the supported upstream interface, site and asset naming, timestamps and access responsibilities with the platform owner.Trace one known field value to its tag, trend and alarm in the receiving system.

What to send for an interface review

  • A diagram showing each instrument, PLC, logger, gateway and destination system in the intended path.
  • Manufacturer model numbers, interface manuals and a small sample point list with the required update rate.
  • Site constraints on power, coverage, network access and who will approve and test the connection.
Prepare a project brief

Talk to our national team

Send your equipment schedule, site locations or monitoring brief. We’ll direct it to the team responsible for your application.

Contact ProSense Group