Alarm response across multiple sites
Define how ProSight operators identify a site, acknowledge an alarm and review the readings around the event.
One site may have a modern PLC and another only a cellular logger. Start by defining the operational view they need to share. ProSense can review the supported data path for each site and scope the dashboards, alarms and reports with the people who will use them.

| Workstream | What to specify | What the operator receives |
|---|---|---|
| Asset and point schedule | List sites, asset names, data sources, units, expected reporting intervals and the time zone used locally. Identify the owner of each gateway or controller. | A consistent site and asset hierarchy with traceable readings and a way to recognise stale data. |
| Role and alarm design | Describe which conditions a site technician, duty operator and regional manager each need to see. Define acknowledgement, responsibility for follow-up and how recovery is verified. | A proposed view and alarm list for each role, with agreed examples to test during the pilot. |
| Reports and rollout | Choose one representative site and report period. Confirm the required history, exports, access and any scheduled distribution with the ProSight team before extending the design. | A sample report and an agreed checklist for repeating the configuration at the next site. |
Send your equipment schedule, site locations or monitoring brief. We’ll direct it to the team responsible for your application.